| MCS LITERATURE LIBRARY | ||
| » Equipment Information | ||
| Dehumidifiers | ^ Back to top | ||
| view cover | | PDF: | DHI-125 | | | ||||||
| view cover | | PDF: | HC-1125 | | | ||||||
| view cover | | PDF: | HC-2250 | | | ||||||
| view cover | | PDF: | HC-4500 | | | ||||||
| view cover | | PDF: | HC-9000 | | | ||||||
| view cover | | PDF: | HCU-3000 | | | ||||||
| view cover | | PDF: | HCU-6000 | | | ||||||
| view cover | | PDF: | M-10 | | | ||||||
| view cover | | PDF: | M-20 | | | ||||||
| view cover | | PDF: | ProDry 1400 | | | ||||||
| Heating Equipment | ^ Back to top | ||
| view cover | | PDF: | HDS-12 | | | ||||||
| view cover | | PDF: | HG-4 | | | ||||||
| view cover | | PDF: | HO-150 KW Electric Heater | | | ||||||
| view cover | | PDF: | HO-64 KW Electric Heater | | | ||||||
| Cooling Equipment | ^ Back to top | ||
| view cover | | PDF: | AHU Unit: 70 Ton | | | ||||||
| view cover | | PDF: | DX Unit: 07 Ton | | | ||||||
| view cover | | PDF: | DX Unit: 08 Ton | | | ||||||
| view cover | | PDF: | DX Unit: 20 Ton | | | ||||||
| view cover | | PDF: | DX Unit: 30 Ton | | | ||||||
| view cover | | PDF: | DX Unit: 6 Ton | | | ||||||
| General Equipment Information | ^ Back to top | ||
| view cover | | PDF: | Equipment Rentals Flier | | | ||||||
| » Application Information | ||
| Construction Drying | ^ Back to top | ||
| view cover | | PDF: | Construction - Open Building | | | ||||||
| view cover | | PDF: | FAQ: Construction Drying | | | ||||||
| view cover | | PDF: | ICRI Reprint - DH For Fast Track Concrete Drying | | | ||||||
| view cover | | PDF: | Partner With Munters to Earn LEED Credits | | | ||||||
| view cover | | PDF: | Temporary Climate Control for Hospital Construction Projects | | | ||||||
| view cover | | PDF: | Temporary Climate Control for School Construction Projects | | | ||||||
| Drying and Restoration Solutions | ^ Back to top | ||
| view cover | | PDF: | Code Blue Program Insert | | | ||||||
| view cover | | PDF: | Document Recovery Insert | | | ||||||
| view cover | | PDF: | Mold Remediation Insert | | | ||||||
| view cover | | PDF: | Open Building Water Damage Recovery Flier | | | ||||||
| view cover | | PDF: | Smoke and Fire Damage Recovery Insert | | | ||||||
| view cover | | PDF: | Water Damage Recovery Insert | | | ||||||
| Surface Preparation and Coating | ^ Back to top | ||
| view cover | | PDF: | ExactAire | | | ||||||
| view cover | | PDF: | JPCL Reprint - Heating Storage Tanks During Cold Coating Work | | | ||||||
| » Case Studies/Reprints | ||
| Case Studies: Disaster Recovery Solutions | ^ Back to top | ||
| view cover | | PDF: | Adelphia Stadium/TN Titans Case Study | | | ||||||
| view cover | | PDF: | American Bible Society Case Study | | | ||||||
| view cover | | PDF: | Cleaning & Restoration Article Reprint, April 2006 - Document Recovery at Notarial Archives | | | ||||||
| view cover | | PDF: | CO State Flood Case Study/ Microbiology Focus | | | ||||||
| view cover | | PDF: | Dallas Radisson Case Study | | | ||||||
| view cover | | PDF: | Electronics Preservation: Computer System Case Study | | | ||||||
| view cover | | PDF: | Hurrican Katrina -- Multiple Project Newsletter | | | ||||||
| view cover | | PDF: | Hurricane Katrina -- Document Recovery at Notarial Archives | | | ||||||
| view cover | | PDF: | Los Angeles, CA Federal Courthouse Case Study | | | ||||||
| view cover | | PDF: | Multi-Faceted Project - Boston's Back Bay Case Study | | | ||||||
| view cover | | PDF: | Munters Restores Pentagon After September 11th Attack | | | ||||||
| view cover | | PDF: | Structural Drying: Saturated Roof Structure Restored Case Study | | | ||||||
| view cover | | PDF: | Trinity Buildings, Air Purification, New York, NYC Case Study | | | ||||||
| Case Studies: Surface Preparation and Coating | ^ Back to top | ||
| view cover | | PDF: | Houston Fuel Oil Co. Case Study (SPC) | | | ||||||
| view cover | | PDF: | Lead Abatement/City of Lakeland, Fl Case Study (SPC) | | | ||||||
| view cover | | PDF: | Lock Gate Coating with Lead Abatement Case Study (SPC) | | | ||||||
| view cover | | PDF: | National Aquarium Case Study (Drying and Coating Concrete) (SPC) | | | ||||||
| view cover | | PDF: | Water Storage Tank/La Mesa, CA Case Study (SPC) | | | ||||||
| Case Studies: Construction Drying | ^ Back to top | ||
| view cover | | PDF: | Ashrae Journal 9/02 - Prevent Mold by Keeping New Construction Dry | | | ||||||
| view cover | | PDF: | Best Buy Case Study (CDS) | | | ||||||
| view cover | | PDF: | Daily Journal of Commerce Reprint-Seattle (CDS) | | | ||||||
| view cover | | PDF: | Moisture Problems (Westin Article Reprint on Back) | | | ||||||
| view cover | | PDF: | Round Rock, Texas School Case Study (CDS) | | | ||||||
| Case Studies: Industrial | ^ Back to top | ||
| view cover | | PDF: | Archival Preservation: Priceless Portuguese Exhibit Case Study (THC) | | | ||||||
| view cover | | PDF: | Ore-Ida Food Processing Case Study (THC) | | | ||||||
| view cover | | PDF: | Peanuts/Madill, OK Case Study (THC) | | | ||||||